Amabel Water Servicing Master Plan
The Town of South Bruce Peninsula (Town) is undertaking a Water Service Master Plan for the area within and adjacent to the Sauble Beach Settlement Area in the former Township of Amabel. The Study will consider solutions that provide servicing capacity for potential development and lower per capita cost for users of the existing systems.
The Town of South Bruce Peninsula (Town) is undertaking a Water Service Master Plan for the area within and adjacent to the Sauble Beach Settlement Area in the former Township of Amabel. The Study will consider solutions that provide servicing capacity for potential development and lower per capita cost for users of the existing systems.
-
PIC #1 Summary Report now available
Share PIC #1 Summary Report now available on Facebook Share PIC #1 Summary Report now available on Twitter Share PIC #1 Summary Report now available on Linkedin Email PIC #1 Summary Report now available linkThe results of the first Public Information Centre for the Amabel Water Master Servicing Study, held online on this Open Mic site between September 21st and October 20th, 2020, is now available. Click here to download the document.
-
Public Information Centre #1 (PIC #1)
Share Public Information Centre #1 (PIC #1) on Facebook Share Public Information Centre #1 (PIC #1) on Twitter Share Public Information Centre #1 (PIC #1) on Linkedin Email Public Information Centre #1 (PIC #1) linkPlease access the documents below for the Project presentation, project boards and comment sheet for the project.
PIC #1 Presentation with Narration
PIC #1 Presentation Boards Only - PDF file
PIC #1 Survey widget - please provide us with your comments via this digital comment sheet. If you prefer, comments may also be submitted to the project contacts using this PIC #1 Comment Sheet.
These documents are also available under the Documents widget at the right side of the screen.
-
Notice of Study Commencement and Online Public Engagement Session
Share Notice of Study Commencement and Online Public Engagement Session on Facebook Share Notice of Study Commencement and Online Public Engagement Session on Twitter Share Notice of Study Commencement and Online Public Engagement Session on Linkedin Email Notice of Study Commencement and Online Public Engagement Session linkConsultation is important to this Study. The Town would like to ensure that anyone interested in this Study has the opportunity to provide input into the planning and design of the Project. Project Information is available on this Open Mic page and at the Town's website.
An on-line Public Information Centre (PIC) will be hosted on this Open Mic page to gather early input from the public during the preliminary stage of the project. Please subscribe for updates to stay up to date with the status of this project.
Presentation and engagement material can be found at https://openmicsouthbrucepeninsula.ca/ starting September 21, 2020. The Town encourages the public to visit the website to view the PIC presentation and provide feedback by October 20, 2020.
Project and Notice information will be made available in accessible formats upon request in accordance with the Accessibility Standard for Information and Communication under the Accessibility for Ontarians with Disabilities Act, 2005 and Town policies regarding accessibility.
Follow Project
Who's Listening
-
JL
Phone 705-797-4269 Email jeff.langlois@rjburnside.com -
LW
Phone 519-534-1400 x133 Email lara.widdifield@southbrucepeninsula.com
Key Dates
-
September 21 2020
-
September 01 2020
-
September 21 2020
-
October 20 2020